Aerial Outside Plant Construction

Pacific Northwest.

What’s on Your Poles?

ROADWAYSNOWSHOESSPLICE CASEPRIMARYNEUTRALFIBERCOAX24 IN24 INSHORT12 IN12 IN15.5 FT15.5 FT1

Joint-Use Pole, Typical SpanElevation, Not to Scale

Violations

Attachment found 24 in below the neutral, lowered to 40 in, condition and correction documented. The audit item closes as a completed work order.

Sheet S.03, NESC Compliance

Sheet S.01 of 05

Emergency Restoration

When plant is down, the call gets answered and the right truck shows up with the right tooling.

ROADWAYSNOWSHOESSPLICE CASEPRIMARYNEUTRALFIBERCOAX40 IN40 INSHORT12 IN12 IN15.5 FT15.5 FT1

Downed Span, Restoration SequenceElevation, Not to Scale

1. Damage

Span down across the roadway.

Sequence

  1. Damage

    Storm damage, downed spans, broken poles and failed attachments. Vehicle strikes on poles and guys.

  2. Make Safe

    Damaged and hazardous spans made safe first, coordinated with the pole owner and utility crews on site.

  3. Repair

    Same-day aerial work on service-affecting outages. Strand, facility and hardware replaced to specification the first time. No temporary, no second trip.

Available for Call-Out, Nights, Weekends and Storm Response.

Repaired right the first time. No temporary, no second trip.

Call-Out Requestsbryantutilityconstruction@gmail.com

Scope

  • Storm damage, downed spans, broken poles, failed attachments
  • Vehicle strikes on poles and guys
  • Service-affecting outages requiring same-day aerial work
  • Make-safe on damaged or hazardous spans
  • Permanent repair on the first trip
  • Coordination with pole owners and utility crews on site

Sheet S.02 of 05

Pole Transfers

A pole can’t be pulled until every attacher has moved. The last attacher holds up the whole job.

ROADWAYSNOWSHOESSPLICE CASEPRIMARYNEUTRALFIBERCOAX40 IN40 INSHORT12 IN12 IN15.5 FT15.5 FT1

Pole Replacement, Communications TransferElevation, Not to Scale

1. New Pole

Power on the new pole. Communications still on the old one.

Sequence

  1. New Pole

    The new pole is set and power has moved. The old pole stays in the air for one reason: the communications plant still on it.

  2. Transfer

    Strand, facility and attachment hardware moved to the new pole, along with service drops, multiport tails, terminals, risers and drop transition boxes.

  3. Ground

    Grounding connections transferred and bonded to the vertical ground on the new pole.

  4. Clear

    Span re-tensioned where the move changed the sag. Pole tagged and documented. The old pole is free to come out.

Communications off the old pole, so it comes out on schedule.

Scope

  • Strand, facility and attachment hardware transferred from old pole to new
  • Existing attachments rearranged to create compliant clearance
  • Grounding connections and bonding transferred to vertical grounds
  • Span re-tension where the transfer changes sag
  • Service drop and multiport tail transfers
  • Terminals, risers and drop transition boxes
  • Pole tagging and field documentation on completion

Sheet S.03 of 05

NESC Compliance

Every item on a pole owner’s audit is a measurement. Each one is checked at the pole and at midspan, brought back into compliance, and closed out as a completed work order.

ROADWAYSNOWSHOESSPLICE CASEPRIMARYNEUTRALFIBERCOAX24 IN24 INSHORT12 IN12 IN15.5 FT15.5 FT1

Clearance at the Pole and MidspanElevation, Not to Scale

1. Found

Attachment measured 24 in below the neutral.

Sequence

  1. Found

    Every condition is measured at the pole and at midspan before anything moves.

  2. Corrected

    The attachment is lowered into compliance and the change is recorded: what was found and what was done.

  3. Attachers

    Vertical separation between communications attachers checked and restored at the pole.

  4. Ground

    Midspan clearance over roadways, driveways and crossings, corrected by re-sag or re-attachment.

Every correction leaves a record: what was found, and what was done about it.

Scope

  • Clearance violations between communications and supply space
  • Vertical separation between communications attachers
  • Midspan clearance over roadways, driveways and crossings
  • Ground clearance correction by re-sag or re-attachment
  • Grounding and bonding deficiencies
  • Guying and anchoring where pole loading is out of spec
  • Documentation of conditions found and corrections made

Sheet S.04 of 05

Fiber and Strand Placing

New aerial plant built the way the print calls for it, span by span.

ROADWAYSNOWSHOESSPLICE CASEPRIMARYNEUTRALFIBERCOAX40 IN40 INSHORT12 IN12 IN15.5 FT15.5 FT1

New Aerial Build, Typical SpanElevation, Not to Scale

Existing Span

Existing plant on the pole, ready for the new strand.

Sequence

  1. Strand

    6M, 10M or 16M messenger placed with pole attachment hardware, bonded to the vertical ground and adjacent messenger.

  2. Lash

    Fiber and coax double lashed. Overlash where the strand is already occupied; delash and relash where existing plant needs it.

  3. Slack

    Slack racked between a pair of snowshoes out along the span from the splice case, placed to spec. Span tensioned and sagged to specification.

  4. Guy & Riser

    Down guy and anchor set where the pole needs it. Riser and U-guard for the underground-to-aerial transition.

Tensioned, lashed and stored the way the specification reads.

Scope

  • Strand placement: 6M, 10M, 16M messenger
  • Pole attachment hardware, bonding to vertical grounds and adjacent messenger
  • Double lashing of fiber and coax
  • Overlash of additional facilities to occupied strand
  • Delash and relash of existing plant
  • Slack storage: snowshoes and coils placed to spec
  • Span tensioning and sag to specification
  • Guying and anchoring
  • Riser and U-guard for underground-to-aerial transition
  • Service drops, pole to premises

Scope Index

Open a line item for the field detail. The drawing follows.

Sheet S.05 of 05

Contact

Tell us what the pole needs.

ROADWAYSNOWSHOESSPLICE CASEPRIMARYNEUTRALFIBERCOAX40 IN40 INSHORT12 IN12 IN15.5 FT15.5 FT1

Service Drop, Pole to PremisesElevation, Not to Scale

Pole to Premises

Scheduled aerial work and emergency call-out, by email.

bryantutilityconstruction@gmail.com

Scheduled aerial work and emergency call-out across the Pacific Northwest.

For Your Vendor File

Company
Bryant Utility Construction LLC
Service Area
Pacific Northwest
Oregon CCB
#263771
USDOT
5423311
Certificates of Insurance
Issued on request, with additional insured and waiver of subrogation endorsements